How long does it take to manufacture and deliver custom rigid packaging?
Lead time for custom rigid packaging depends on whether the order uses an existing container design or requires a new mould, as well as the material, capacity, colour, closure, quantity, IML requirements, testing, and delivery destination.
Production using an existing qualified mould is generally more straightforward than developing a completely new container. A new custom design can require engineering, mould development, trials, dimensional checks, compatibility testing, artwork approval, and production validation before commercial quantities are manufactured.
Brands should therefore confirm their launch or filling schedule early in the project. Sampling and testing should be included in the timeline rather than treating production and dispatch as the only lead-time components.